Prototype Assembly Transition: Mar 11-17

Following completion of initial component procurement, Chenault Aerospace transitioned the tactical FPV demonstrator program from architecture definition into prototype assembly preparation.

Engineering activity during this phase centered on confirming that the selected 10-inch, 6S multirotor configuration could move into physical integration without introducing unnecessary complexity in layout, service access, or component replacement.

This period established the bridge between early configuration studies and hands-on build activity, positioning the demonstrator program to begin first-article assembly and subsequent system validation.

Previous
Previous

Component Intake and Inspection: Mar 18-24

Next
Next

Demonstrator Component Procurement: Mar 7-10